Make a Selection
|
 |
3MU/JS 180-12
Also known as 3MUJS18012.
|
 |
3MU/JS 180-13
Also known as #MUJS18013.
|
 |
CEJ 113 P
Tilt-up concrete panels, steel or aluminum framing, interior surface concrete, foil faced curtain wall insulation is optional. 2 hour design. Also referred as CEJ113P.
|
 |
CEJ 114 P
Steel spandrel panels, steel stud framing, interior surface gypsum, curtain wall insulation is optional. 2 hour design. Also referred as CEJ114P.
|
 |
CEJ 115 P
Steel spandrel panels, steel stud framing, interior surface foil faced, foil faced curtain wall insulation is required. 2 hour design. Also referred as CEJ115P.
|
 |
CEJ 116 P
Glass spandrel panels, aluminum framing, interior surface foil faced, foil faced curtain wall insulation is required. 2 hour design. Also referred as CEJ116P.
|
 |
CEJ 119 P
Concrete spandrel panels, steel stud framing, interior surface concrete, curtain wall insulation is optional. 2 hour design. Also referred as CEJ119P.
|
 |
CEJ 120 P
Aluminum spandrel panels, steel stud framing, interior surface gypsum, foil faced curtain wall insulation is required. 2 hour design. Also referred as CEJ120P.
|
 |
CEJ 121 P
Glass spandrel panels, steel stud framing, interior surface gypsum, foil faced curtain wall insualtion is required. 2 hour design. Also referred as CEJ121P.
|
 |
CEJ 122 P
Aluminum spandrel panels, steel stud framing, interior surface foil faced, foil faced curtain wall insulation is required. 2 hour design. Also referred as CEJ122P.
|
 |
CEJ 123 P
Glass spandrel panels, steel stud framing, interior surface foil faced, foil faced curtain wall insulation is required. 2 hour design. Also referred as CEJ123P.
|
 |
CEJ 124 P
Aluminum spandrel panels, aluminum framing, interior surface foil faced, foil faced curtain wall insulation is required. 2 hour design. Also referred as CEJ124P.
|
 |
CEJ 125 P
Steel spandrel panels, aluminum framing, interior surface foil faced, foil faced curtain wall insulation is required. 2 hour design. Also referred as CEJ125P.
|
 |
CEJ 126 P
Concrete spandrel panels, aluminum framing, interior surface foil faced, foilfaced curtain wall insulation is required. 2 hour design. Also referred as CEJ126P.
|
 |
CEJ 158 P
Tilt-up concrete panels, attached directly to structural framing, interior surface concrete, curtain wall insulation is optional. 2 hour design. Also referred as CEJ158P.
|
 |
CEJ 159 P
Steel spandrel panels, steel stud framing, interior surface gypsum, foil faced curtain wall insulation is optional. 2 hour design. Also referred as CEJ159P.
|
 |
CEJ 160 P
Steel spandrel panels, steel stud framing, interior surface foil faced, foil faced curtain wall insulation is required. 2 hour design. Also referred as CEJ160P.
|
 |
CEJ 161 P
Glass spandrel panels, aluminum framing. Foil faced curtain wall insulation is required. See system for details on packing material compression and movement capabilities. Max 8 in. joint. 3 hour F rating. 2-1/2 hour T rating. Also known as CEJ161P.
|
 |
CEJ 162 P
Concrete spandrel panels, steel stud framing, interior surface concrete, foil faced curtain wall insulation is optional. 3 hour design. Also referred as CEJ162P.
|
 |
CEJ 163 P
Aluminum spandrel panels, steel stud framing, interior surface gypsum, foil faced curtain wall insulation is required. 2 hour design. Also referred as CEJ163P.
|
 |
CEJ 164 P
Glass spandrel panels, steel stud framing, interior surface gypsum, curtain wall insulation required. 2 hour design. Also referred as CEJ164P.
|
 |
CEJ 165 P
Aluminum spandrel panels, steel stud framing, interior surface is foil faced curtain wall insulation. 3 hour design. Also referred as CEJ165P.
|
 |
CEJ 166 P
Glass spandrel panels, steel stud framing, interior surface is foil faced curtain wall insulation. 3 hour design. Also referred as CEJ166P.
|
 |
CEJ 167 P
Aluminum spandrel panels, aluminum framing. Foil faced curtain wall insulation is required. See system for details on packing material compression and movement capabilities. Max 8 in. joint. 3 hour F rating. 2-1/2 hour T rating. Also known as CEJ167P.
|
 |
CEJ 168 P
Steel spandrel panels, aluminum tube framing, interior surface is foil faced curtain wall insulation. 3 hour design. Also referred as CEJ168P.
|
 |
CEJ 169 P
Concrete spandrel panels, aluminum tube framing, interior surface is foil faced curtain wall insulation. 3 hour design. Also referred as CEJ169P.
|
 |
CEJ 234 P
EIFS system, steel stud framing, interior surface type X gypsum, curtain wall insulation required. 1 hour design. Also referred as CEJ234P.
|
 |
CEJ 238 P
EIFS system, steel stud framing, interior surface type X gypsum, curtain wall insulation required. 3 hour design. Also referred as CEJ238P.
|
 |
CEJ 266 P
Steel Back-Pan, aluminum framing, glass spandrel on exterior, vision glass, foil faced curtain wall insulation is required. 2 hour design. Horizontal movement 10 % + or - . Vertical shear movement 6.25% = or - . Also referred as CEJ266P.
|
 |
CEJ 267 P
Steel Back-Pan, aluminum tube framing, aluminum spandrel on exterior, vision glass, foil faced curtain wall insulation is required. 2 hour design. Horizontal movement 10 % + or - . Vertical shear movement 6.25% = or - . Also referred as CEJ267P.
|
 |
CEJ 288 P
Pre-Cast concrete panel, steel or aluminum framing, vision glass, foil faced curtain wall insulation is required. 2 hour design. Horizontal movement 16.7 % + or - . Vertical shear movement 6.25% = or - . Also referred as CEJ288P.
|
 |
CEJ 289 P
Pre-Cast concrete panel, steel framing, vision glass, foil faced curtain wall insulation is optional . 2 hour design. Horizontal movement 16.7 % + or - . Vertical shear movement 6.25% = or - . Also referred as CEJ289P.
|
 |
CEJ 295 P
Spandrel glass, aluminum I-Mullion framing, vision glass, foil faced curtain wall insulation is required. 3 hour design. Also referred as CEJ295P.
|
 |
CEJ 311 P
Granite spandrel panel, aluminum tube framing, vision glass, foil faced curtain wall insulation is required. 3 hour design. Horizontal movement 16.7% + or - . Vertical shear movement 6.25% = or - . Also referred as CEJ311P.
|
 |
CEJ 312 P
Granite spandrel panel, aluminum tube framing, vision glass, foil faced curtain wall insulation is required. 3 hour design. Horizontal movement 16.7% + or - . Vertical shear movement 6.25% = or - . Also referred as CEJ312P.
|
 |
CEJ 313 P
Granite spandrel panel, aluminum tube framing, vision glass, foil faced curtain wall insulation is required. 2 hour design. Horizontal movement 16.7% + or - . Vertical shear movement 6.25% = or - . Also referred as CEJ313P.
|
 |
CEJ 370 P
Optional curtain wall insulation. Optional interior curtain wall surface, knee-wall. Exterior curtain wall finish: EIFS, glass panels, aluminum panels, brick, stucco, stone, siding, GFRC panels. Steel framing. Optional vision glass. 0% horizontal and vertical shear movement. Maximum 8-1/2 in. joint. 2 hour F rating. 1 hour T rating. Also known as CEJ370P.
|
 |
CEJ 371 P
Pre-cast concrete panels with max. 1 in. butt joints. Curtain wall insulation seams must be offset from panel joints. Optional vision glass. +/- 10% horizontal movement @25% compression. =/- 6.25% vertical shear movement@25% compression. Max 8 in. joint. 2 hour F Rating. 0 hour T Rating. Also known as CEJ371P.
|
 |
CEJ 372 P
Pre-cast concrete panels with max. 1 in. butt joints. Curtain wall insulation seams must be offset from panel joints. Optional vision glass. +/- 10% horizontal movement @33% compression. =/- 6.25% vertical shear movement@33% compression. Max 8 in. joint. 2 hour F Rating. 0 hour T Rating. Also known as CEJ372P.
|
 |
CW-S-2004
Glass Spandrel panels, curtain wall insulation required. Max 8 in. joint. Static system. Aluminum framing. Vision panels. 2 hour Integrity rating. Also known as CWS2004.
|
 |
CW-S-2005
Granite Spandrel panels. Curtain wall insulation required. Max 8 in. joint. Static system. Aluminum framing. Vision panels. 2 hour Integrity rating. Also known at CWS2005.
|
 |
CW-S-2007
Aluminum Spandrel panels. Curtain wall insulation required. Max 8 in. joint. Static system. Aluminum framing. Vision panels. 2 hour Integrity rating. Also known as CWS2007.
|